Monday, March 1, 2021

More Mock Up Buildings and Some Track Realignment

Part of my overall track laying strategy was to temporarily lay track then revise after operating and fitting in buildings. This process continues on the stretch of track at the docks on the 6th and 7th Street piers.

I moved the switch back at 7th St to be able to get the two tracks into the pier headhouse. Of course, there are conflicting accounts in different maps about the exact arrangement - but I'm over that, and I am comfortable taking my best shot at the most prototypical and operationally optimal arrangement. 

Original configuration:

And here's the track with switch moved back and the warehouse with four 40' car capacity.



I also mocked up Campbell Stores at the adjacent 6th St pier to the left and the East Asiatic Import/Export Company (long warehouse) to the right. Some issues with viewing cars and such, of course, so some trial operating will need to be done. The East Asiatic warehouse is especially a problem, so some sort of cut away representation may be in order.


At Campbell Stores, dock doors provide a target spot for operators from the inside. An interesting view point as well as an opportunity to model the interior of the building. Not sure how to handle the section cut yet. 



Along River Road and Hudson Streets, there are several multistory rowhouses that will essentially provide a view block. Because of compression of space, these particular ones will probably represent different buildings on each side.