Tuesday, July 23, 2013

Updated Locomotive Photos



I have updated the Erie Locomotive page with several 300 and 400 series locomotive photographs I currently have on hand. There are some weird formatting issues I am still wrestling with Blogger on, hence why a couple of images are out of sequence and caption spacing is off. I probably am asking too much posting so many photos in one entry.

Friday, July 19, 2013

Scale Test





I finished making a couple of triangular modules and setting them and the rest of the peninsula dominos in place and adjusting legs. Also spent some time relocating legs on some modules to provide a toe space (about 3-1/2") on the aisles. 

Photos show a quickie test on the completed peninsula bench work and how the Lipton Tea building will dwarf rolling stock. The cardboard model approximates true scale size of the multistory edifice. There won't be much sunshine in between the 12 story wings...

Thursday, July 18, 2013

Bethlehem Steel [Wooden] Bench Work

Progress today on the bench work. I was able to assemble the end piece of the peninsula from four existing modules and switch out legs on a module to shorten it for water, piers and ships at the Bethlehem Steel Shipyard area of the layout. I also constructed a triangular module (hiding in lower-middle left of photo poking up behind a backdrop board) that will create the transition connection between the wall modules and the 45 degree peninsula. I realized after making the 3' right triangle module, that I should have made it in two pieces so I can lower one side. I think I can take a pass at with the circular saw to get that accomplished. A shame, because the angles were cut really well and it came together so easily.
Bethlehem Steel area. The lower sections will be water, piers and ships. Nice geometric arrangement of the modules. The unconnected module upper middle right doesn't belong there. It will be used as a pier module at Holland America.

Another view. The portion jutting out towards us will be the tail track for switching at Bethlehem. I just noticed that the latest track plan has a mistake here at Bethlehem regarding this track. The pier tracks should be trailing points from this tail track and not the runaround as shown.


The glass door and balcony will remain accessible, but I will devise a portable backdrop for modeling photography when that time comes...
Assembling the end modules provided a satisfying visceral appreciation for the domino type construction method. Being able to play with the configuration of the smaller pieces allowed me to think physically for a brief moment about the layout that I had not yet experienced. This actually led to a bit of a rush starting to think about how to position the buildings and having sections of big ships dwarfing the 44 tonners who will be scurrying around the shipyard. Interesting feeling that I haven't felt in a long time since I haven't been making things on a regular basis for quite awhile. Hopefully a portend of more good feelings to come.

I must say, also, that the geometry of the bench work itself is actually very satisfying visually. Good composition that reminds me of a [better] version of the Chase Manhattan Bank logo.

Logo for the Hoboken Shore Railroad



PoNY version (updated 07/20/2013)
Trying year marks with noise added for aging.
Noodling around on a new 'authentic-looking' logo for the HBS... I think this would look good on a hat or tee shirt.

Monday, July 15, 2013

Some More Locomotive Photos

Erie № 418 EMD NW-2 blt.10-49
Erie № 420 EMD NW-2 blt. 10-49
Erie № 520 Alco S-2 blt. 5-49 mu equipped
HBS № 701 GE 44-tonner

Harlem Transfer Company HTCO № 53 GE 44-tonner

Sunday, July 14, 2013

Track Plan Update


This is the second pass at the track plan using Rail Modeller that starts to clean up minimum radii, alignment and details at industries. I'm fairly happy with both the Erie and HBS yards, Maxwell House, and the float yard/carfloat areas. I'm still questioning the Seatrain pier area as I don't have enough room to separate the piers enough for ships at this point. 

At Bethlehem the piers work out pretty well so that I can get piers and ships in between them. I also still need to pay closer attention to the end of the line at Holland America and neighbors as this is not quite the prototype track arrangement. At this point there are approximately 100 switches - yowza...

Next, I will address those issues, and then I'll start adding more building footprints to ensure they work with the track. The key buildings are shown, but I will use this plan to place row houses, flats, ancillary structures, etc. For instance, the dead corner behind Litpon's at the left end of the HBS yard can hold a nice deep street scene that could extend all the way down the divider to Maxwell House and around the bend. 

I have also had a realization after working closely with the track plan and other original documents, that the HBS was no slouch of an operation in terms of amount of traffic. I have always had a sleepy little short line railroad in my head when working on the layout, but now I'm shifting to a vision of a scrappy little bulldog of a railroad. They had many run ins with bankruptcy, being sold, etc., which is probably due to the ups and downs of the industries it served. I'll need to do some more serious research on the business side of the operations, but a cursory look at their later earnings indicates that WWII was extremely busy followed by a slow tapering decline all the way to the demise in the 70s and 80s. 

Track laying will begin in the HBS yard, and then progress south (left) down the Hudson.