Sunday, July 28, 2013

1955 HBS Track Plan

From the HBS Real Estate Report, 1955 in collection of author.
Enlarged view of HBS Yard
This track plan is kind of buried in the HBS Report, so I thought I would post here for Bruce, Mark and all the folks following their Hoboken Shore layout construction at Railroad Line Forums. The enlarged view shows the location of the double slip switches in the conversation. There is a nice post on page three of that thread which has images of a brochure probably from the 60s.

Thursday, July 25, 2013

Deconstruction

I'm trying to clear out the layout room for upcoming guests and general well-being. To do this, the next step is getting the 149th in a more mobile and storable condition. 

The deconstruction of the Erie 149th Street Yard


Wires removed, track lifted mostly intact on black floor underlayment, outriggers for new fascia board installing, and the dense 15-ply Baltic Birch plywood being removed. The adhesive caulk used to secure the underlayment and track popped right up with only a modicum of effort. 

Had to quit for the evening before finishing since tomorrow is an early morning, but I made good progress. I'm thinking 3/16" Gatorfoam over 3/4" extruded foam insulation board on top of the existing pine framing. (See modelrailroaddesign.blogspot.com for discussion of options.) This is a combination of expediency, bricolage, and good ol' laziness. (It was expediency that led me to use the densest plywood in the world the first time around.) 

I think I'm going to explore the more space age semi-monocoque designs that Joe Brant introduced to the conversation over at my other blog for future construction of pocket terminals. For now, I want to get done and get back to the HBS construction. 

Pictures of process:

Bay Transportation, Suzy Q, and soldering iron
Last spots these cars will see for awhile
Cleared of everything 
Underlayment comes up easily
Just a few spots where the adhesive hung on tight
Completely cleared
Track still attached to the underlayment transferred easily in two pieces. WIth any luck, I can just transfer it back to the new base.
Outrigger spacer blocks for new fascia perimeter board.
Glued, not screwed.
One can never have enough clamps.
Plywood removed reveals lightweight (comparatively) framework.
Momma clamp and baby clamp - everyone got their pads on wood today.











Wednesday, July 24, 2013

Revised Plan

Track plan 24 July 2013
A revised track plan with the Bethlehem Steel tracks reversed and the Seatrain and Piers 14-16 tracks reconfigured. The HBS yard is also moved forward towards the operator to help with reach and will also allow room for buildings between the yard and the 14th Street industries.

I am still working my way around the layout taking operator reach and position in mind while adding buildings and scenery elements. One of those elements might be a Faller car system as used at Miniatur Wunderland. The airport emergency vehicles are pretty amazing. This is a whole 'nuther set of design considerations...

In the meantime, I think I am close to ordering track to start laying the HBS yard.

Tuesday, July 23, 2013

Updated Locomotive Photos



I have updated the Erie Locomotive page with several 300 and 400 series locomotive photographs I currently have on hand. There are some weird formatting issues I am still wrestling with Blogger on, hence why a couple of images are out of sequence and caption spacing is off. I probably am asking too much posting so many photos in one entry.

Friday, July 19, 2013

Scale Test





I finished making a couple of triangular modules and setting them and the rest of the peninsula dominos in place and adjusting legs. Also spent some time relocating legs on some modules to provide a toe space (about 3-1/2") on the aisles. 

Photos show a quickie test on the completed peninsula bench work and how the Lipton Tea building will dwarf rolling stock. The cardboard model approximates true scale size of the multistory edifice. There won't be much sunshine in between the 12 story wings...

Thursday, July 18, 2013

Bethlehem Steel [Wooden] Bench Work

Progress today on the bench work. I was able to assemble the end piece of the peninsula from four existing modules and switch out legs on a module to shorten it for water, piers and ships at the Bethlehem Steel Shipyard area of the layout. I also constructed a triangular module (hiding in lower-middle left of photo poking up behind a backdrop board) that will create the transition connection between the wall modules and the 45 degree peninsula. I realized after making the 3' right triangle module, that I should have made it in two pieces so I can lower one side. I think I can take a pass at with the circular saw to get that accomplished. A shame, because the angles were cut really well and it came together so easily.
Bethlehem Steel area. The lower sections will be water, piers and ships. Nice geometric arrangement of the modules. The unconnected module upper middle right doesn't belong there. It will be used as a pier module at Holland America.

Another view. The portion jutting out towards us will be the tail track for switching at Bethlehem. I just noticed that the latest track plan has a mistake here at Bethlehem regarding this track. The pier tracks should be trailing points from this tail track and not the runaround as shown.


The glass door and balcony will remain accessible, but I will devise a portable backdrop for modeling photography when that time comes...
Assembling the end modules provided a satisfying visceral appreciation for the domino type construction method. Being able to play with the configuration of the smaller pieces allowed me to think physically for a brief moment about the layout that I had not yet experienced. This actually led to a bit of a rush starting to think about how to position the buildings and having sections of big ships dwarfing the 44 tonners who will be scurrying around the shipyard. Interesting feeling that I haven't felt in a long time since I haven't been making things on a regular basis for quite awhile. Hopefully a portend of more good feelings to come.

I must say, also, that the geometry of the bench work itself is actually very satisfying visually. Good composition that reminds me of a [better] version of the Chase Manhattan Bank logo.

Logo for the Hoboken Shore Railroad



PoNY version (updated 07/20/2013)
Trying year marks with noise added for aging.
Noodling around on a new 'authentic-looking' logo for the HBS... I think this would look good on a hat or tee shirt.