Monday, August 26, 2013

Railcars

 Erie 300
Erie 370

I don't know anything about these at this point, but the Erie had some of these railcars at some point. They would make a good 3d printing project. 

Tuesday, July 30, 2013

Buildings and streets and water...

... Oh, my!

Latest plan with details starting to flesh out the scenery.

click for enlarged view
Of particular note is the center peninsula with 14th Street running almost the entire length terminating in the viaduct that climbs the hillside to West Hoboken. Instead of having a backdrop that divides the scene, I am opting for a scene that divides the scene. (Buildings are only placeholders at the moment, more specific prototype footprints to come.) This will provide some good urban density to the layout which will give context to the bustle of the industrial railroading. The goal is to capture how the railroad is sandwiched between the Hudson River and a dense urban fabric. The track has been pulled toward the aisles on both sides to accommodate a wider street (Faller car system?!).


Some minor evolution at the end of the peninsula with the domino at the Bethlehem piers shrinking to 18 inch depth. This has already been implemented and provides better reach to tracks as well as more room in the aisle. The minimum aisle width is now 4'-2". What isn't showing is a closet in the Erie pier area (bottom right) that leaves about an 18 inch clearance between it and the peninsula at the moment. I've tricked myself into thinking the closet is going away, but doubts are creeping into the picture...


At the moment there is some spatial distortion taking place with the street grid - we'll see if it remains. The streets above the HBS yard are the same streets that cross the peninsula at 14th Street as 14th actually runs above the yard in real life. The industries above the yard are in the alley in the block between 14th and 15th Streets. A modeling compromise that seems OK at the moment.


A couple of strong personal ties to the history of Hoboken will be a part of the layout. I've added a baseball field to represent Elysian Field and the birth of The Game, and Hamilton and Burr (an ancestor of mine) will be dueling somewhere around there as well.


I've also got some room for big ship models.

Next steps on the plan will be to tighten up the streets (it's a little hard to manipulate shapes in Rail Modeler), check buildings and track more closely against maps and images, and make out a shopping list for track.

Next bit of constructing will be on the 149th to complete its transformation to a lightweight layout so the room can become a guest room again. I've only got a couple of more weeks of concerted work time before I get crazy busy again for the next nine months.

Sunday, July 28, 2013

1955 HBS Track Plan

From the HBS Real Estate Report, 1955 in collection of author.
Enlarged view of HBS Yard
This track plan is kind of buried in the HBS Report, so I thought I would post here for Bruce, Mark and all the folks following their Hoboken Shore layout construction at Railroad Line Forums. The enlarged view shows the location of the double slip switches in the conversation. There is a nice post on page three of that thread which has images of a brochure probably from the 60s.

Thursday, July 25, 2013

Deconstruction

I'm trying to clear out the layout room for upcoming guests and general well-being. To do this, the next step is getting the 149th in a more mobile and storable condition. 

The deconstruction of the Erie 149th Street Yard


Wires removed, track lifted mostly intact on black floor underlayment, outriggers for new fascia board installing, and the dense 15-ply Baltic Birch plywood being removed. The adhesive caulk used to secure the underlayment and track popped right up with only a modicum of effort. 

Had to quit for the evening before finishing since tomorrow is an early morning, but I made good progress. I'm thinking 3/16" Gatorfoam over 3/4" extruded foam insulation board on top of the existing pine framing. (See modelrailroaddesign.blogspot.com for discussion of options.) This is a combination of expediency, bricolage, and good ol' laziness. (It was expediency that led me to use the densest plywood in the world the first time around.) 

I think I'm going to explore the more space age semi-monocoque designs that Joe Brant introduced to the conversation over at my other blog for future construction of pocket terminals. For now, I want to get done and get back to the HBS construction. 

Pictures of process:

Bay Transportation, Suzy Q, and soldering iron
Last spots these cars will see for awhile
Cleared of everything 
Underlayment comes up easily
Just a few spots where the adhesive hung on tight
Completely cleared
Track still attached to the underlayment transferred easily in two pieces. WIth any luck, I can just transfer it back to the new base.
Outrigger spacer blocks for new fascia perimeter board.
Glued, not screwed.
One can never have enough clamps.
Plywood removed reveals lightweight (comparatively) framework.
Momma clamp and baby clamp - everyone got their pads on wood today.











Wednesday, July 24, 2013

Revised Plan

Track plan 24 July 2013
A revised track plan with the Bethlehem Steel tracks reversed and the Seatrain and Piers 14-16 tracks reconfigured. The HBS yard is also moved forward towards the operator to help with reach and will also allow room for buildings between the yard and the 14th Street industries.

I am still working my way around the layout taking operator reach and position in mind while adding buildings and scenery elements. One of those elements might be a Faller car system as used at Miniatur Wunderland. The airport emergency vehicles are pretty amazing. This is a whole 'nuther set of design considerations...

In the meantime, I think I am close to ordering track to start laying the HBS yard.