Wednesday, July 24, 2013

Revised Plan

Track plan 24 July 2013
A revised track plan with the Bethlehem Steel tracks reversed and the Seatrain and Piers 14-16 tracks reconfigured. The HBS yard is also moved forward towards the operator to help with reach and will also allow room for buildings between the yard and the 14th Street industries.

I am still working my way around the layout taking operator reach and position in mind while adding buildings and scenery elements. One of those elements might be a Faller car system as used at Miniatur Wunderland. The airport emergency vehicles are pretty amazing. This is a whole 'nuther set of design considerations...

In the meantime, I think I am close to ordering track to start laying the HBS yard.

No comments:

Post a Comment